SUPERTRAM ASSET REVIEW OF WORK TO FLOAT THE SYSTEM
The stray current collection system for Supertram incorporates two measures to try and reduce the effects of current leaking from the rails, these two measures are:- ⢠Earth drainage diodes at the substations, creating a directional connection between the substation earth mat and the negative busbar ⢠Stray current collection system with associated drainage diodes. As a result of work looking at the renewal of the Supertram system SYPTE request consultancy advice in order to understand the work required to floa...
Buyer
SOUTH YORKSHIRE MAYORAL COMBINED AUTHORITY
Value
£14,000
Published
26 Sept 2017
Closes
21 Jul 2017
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Open
Category
Services
Contract starts
26 Sept 2017
Contract ends
1 Nov 2017
CPV classifications
71311200
Transport systems consultancy services
Lots
Lot default SUPERTRAM ASSET REVIEW OF WORK TO FLOAT THE SYSTEM
£20,000
The stray current collection system for Supertram incorporates two measures to try and reduce the effects of current leaking from the rails, these two measures are:- ⢠Earth drainage diodes at the substations, creating a directional connection between the substation earth mat and the negative busbar ⢠Stray current collection system with associated drain...
Documents
Unlock document linkOpportunity notice on Contracts Finder
28 Jun 2017
Opportunity notice on Contracts Finder
Tender notice · Web page
Awarded contract notice on Contracts Finder
26 Sept 2017
Awarded contract notice on Contracts Finder
Award notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.