UKRI-2862 Installation of Fibre to provide Resilient Connectivity to Underground Areas
STFC Boulby lab operates at Boulby mine - a working Polyhalite and Salt Mine run by ICL-UK in the North East of England. This optical fibre installation work will install a secondary cable in the main mine shaft and two further cables underground, one attached to the roof of the mine tunnel between the existing laboratory and the new site and the second in a channel in the floor of the mine tunnel between the two locations. This will provide a diverse network with built in redundancy should one cable be damaged.
Buyer
UK Research & Innovation (UKRI)
Value
£189,968
Published
7 Feb 2023
Closes
1 Feb 2023
Procurement details
Source
Contracts Finder
Region
Swindon
Procurement method
Other
Category
Goods
Contract starts
8 Feb 2023
Contract ends
31 Mar 2023
CPV classifications
32561000
Fibre-optic connections
Lots
Lot default UKRI-2862 Installation of Fibre to provide Resilient Connectivity to Underground Areas
£189,968
STFC Boulby lab operates at Boulby mine - a working Polyhalite and Salt Mine run by ICL-UK in the North East of England. This optical fibre installation work will install a secondary cable in the main mine shaft and two further cables underground, one attached to the roof of the mine tunnel between the existing laboratory and the new site and the second in a...
Delivery: British Oversea Territories, Channel Islands, Europe, Isle of Man, Rest of the World, United Kingdom
Documents
Unlock document linkAwarded contract notice on Contracts Finder
7 Feb 2023
Awarded contract notice on Contracts Finder
Award notice · Web page
Please follow this link to view the notice.
Not provided
Please follow this link to view the notice.
Tender notice
Contains public sector information licensed under the Open Government Licence v3.0.