UKRI-3147 Procurement of Helium Compressor for LBNF Target
The compressor will be used in a closed-loop circuit to circulate helium gas at warm (non-cryogenic) temperatures. The helium is used to remove the c.25 kW heat load generated in a graphite target in the Long Baseline Neutrino Facility (LBNF) beamline at Fermilab, near Chicago. The target is required to convert a 1.2MW proton beam into a neutrino beam for the physics experiment DUNE. The delivery of a suitable compressor to Fermilab, along with other key helium circuit components outside the scope of this document,...
Buyer
UK Research & Innovation (UKRI)
Value
£230,000
Published
13 Mar 2024
Closes
26 Apr 2024
Procurement details
Source
Contracts Finder
Region
Swindon
Procurement method
Open
Category
Goods
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
42123100
Gas compressors
Lots
Lot default UKRI-3147 Procurement of Helium Compressor for LBNF Target
£230,000
The compressor will be used in a closed-loop circuit to circulate helium gas at warm (non-cryogenic) temperatures. The helium is used to remove the c.25 kW heat load generated in a graphite target in the Long Baseline Neutrino Facility (LBNF) beamline at Fermilab, near Chicago. The target is required to convert a 1.2MW proton beam into a neutrino beam for th...
Delivery: South East · United Kingdom, South East, United Kingdom
Documents
Unlock document linkOpportunity notice on Contracts Finder
13 Mar 2024
Opportunity notice on Contracts Finder
Tender notice · Web page
Please follow this link to view the notice.
Not provided
Please follow this link to view the notice.
Tender notice
Contains public sector information licensed under the Open Government Licence v3.0.