Open Tenderocds-b5fd17-2aa11ea1-2b00-47e9-9e41-df5de9dfe993

562589 - Area 14 Structures CCTV Investigation

The drainage asset survey consists of inspections at six locations. The cross carriageway culverts are typically 15-30m in length for single and dual carriageway sections respectively. Traffic management, where required, shall be provided by the M&R Contractor, CHC. The recommended TM layout or suitable alternative is detailed below for each location. Environmental RAG / location plans are provided by the Client which the Contractor shall review and action where required to determine safe system of working prior to...

Buyer

Highways England

Value

£15,000

Published

20 Sept 2017

Closes

13 Oct 2017

Procurement details

Source

Contracts Finder

Region

United Kingdom

Procurement method

Open

Category

Works

Contract starts

Not provided

Contract ends

Not provided

CPV classifications

45232450

Drainage construction works

Lots

Lot default 562589 - Area 14 Structures CCTV Investigation

£15,000

The drainage asset survey consists of inspections at six locations. The cross carriageway culverts are typically 15-30m in length for single and dual carriageway sections respectively. Traffic management, where required, shall be provided by the M&R Contractor, CHC. The recommended TM layout or suitable alternative is detailed below for each location. Enviro...

Delivery: North East · United Kingdom, North East, United Kingdom

Opportunity notice on Contracts Finder

20 Sept 2017

Opportunity notice on Contracts Finder

Tender notice · Web page

Contains public sector information licensed under the Open Government Licence v3.0.