562589 - Area 14 Structures CCTV Investigation
The drainage asset survey consists of inspections at six locations. The cross carriageway culverts are typically 15-30m in length for single and dual carriageway sections respectively. Traffic management, where required, shall be provided by the M&R Contractor, CHC. The recommended TM layout or suitable alternative is detailed below for each location. Environmental RAG / location plans are provided by the Client which the Contractor shall review and action where required to determine safe system of working prior to...
Buyer
Highways England
Value
£2,400
Published
14 Nov 2017
Closes
13 Oct 2017
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Open
Category
Works
Contract starts
13 Nov 2017
Contract ends
20 Nov 2017
CPV classifications
45232450
Drainage construction works
Lots
Lot default 562589 - Area 14 Structures CCTV Investigation
£15,000
The drainage asset survey consists of inspections at six locations. The cross carriageway culverts are typically 15-30m in length for single and dual carriageway sections respectively. Traffic management, where required, shall be provided by the M&R Contractor, CHC. The recommended TM layout or suitable alternative is detailed below for each location. Enviro...
Delivery: North East · United Kingdom, North East, United Kingdom
Documents
Unlock document linkAwarded contract notice on Contracts Finder
14 Nov 2017
Awarded contract notice on Contracts Finder
Award notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.