Supply and manipulation of Boiler Tubes
The supply of Complete Boiler Elements or individual tubes to the design of the boiler components currently installed. The bending of tube shall be in accordance with the requirements of BS EN 12952 and controlled to minimise distortion and/or thinning of the tube on the bend radius. All materials shall be manufactured and tested in accordance with PED 97/23/EC and BS EN 10216-2:2003 (seamless steel tubes for pressure purposes). All tube is seamless cold drawn precisions steel, manufactured and tested in accordance...
Buyer
LondonEnergy Ltd
Value
£500,000
Published
5 Feb 2018
Closes
22 Dec 2017
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Open
Category
Services
Contract starts
1 Jan 2018
Contract ends
31 Dec 2023
CPV classifications
44163000
Pipes and fittings
Lots
Lot default Supply and manipulation of Boiler Tubes
£500,000
The supply of Complete Boiler Elements or individual tubes to the design of the boiler components currently installed. The bending of tube shall be in accordance with the requirements of BS EN 12952 and controlled to minimise distortion and/or thinning of the tube on the bend radius. All materials shall be manufactured and tested in accordance with PED 97/23...
Delivery: London · United Kingdom, London, United Kingdom
Documents
Unlock document linkAwarded contract notice on Contracts Finder
5 Feb 2018
Awarded contract notice on Contracts Finder
Award notice · Web page
Please follow this link to view the notice.
Not provided
Please follow this link to view the notice.
Tender notice
Contains public sector information licensed under the Open Government Licence v3.0.