G4_1_HCC_029 WHITCHURCH ACCESSIBILITY AND TRAFFIC MEASURES - PHASE 2
A call-off from the Generation 4-ONE 2020 - 2024 Civil Engineering, Highways and Transportation Collaborative Framework (Published 4 May 2020). Provision of a shared used facility along Winchester Street, from the junction with A34 at Nuns Walk to Webbs Farm Close. Works include: ⢠footway pavement construction and resurfacing; ⢠tactile paving; ⢠Ditch re-profiling; ⢠Embankment regrading; ⢠Signage and road markings; and ⢠vegetation cut-back.
Buyer
HAMPSHIRE COUNTY COUNCIL
Value
£119,049
Published
10 Dec 2021
Closes
19 Nov 2021
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Selective
Category
Works
Contract starts
27 Mar 2022
Contract ends
19 Aug 2022
CPV classifications
45233000
Construction, foundation and surface works for highways, roads
Lots
Lot default G4_1_HCC_029 WHITCHURCH ACCESSIBILITY AND TRAFFIC MEASURES - PHASE 2
£119,049
A call-off from the Generation 4-ONE 2020 - 2024 Civil Engineering, Highways and Transportation Collaborative Framework (Published 4 May 2020). Provision of a shared used facility along Winchester Street, from the junction with A34 at Nuns Walk to Webbs Farm Close. Works include: ⢠footway pavement construction and resurfacing; ⢠tactile paving; ⢠Ditc...
Delivery: South East · United Kingdom, South East, United Kingdom
Documents
Unlock document linkAwarded contract notice on Contracts Finder
10 Dec 2021
Awarded contract notice on Contracts Finder
Award notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.